Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 177 of 1370

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez about 1 year ago in Info360 Asset 1 Gathering support

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis over 1 year ago in Info360 Asset / Data Editing 1 In progress

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez over 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

User defined CCTV inspection codes, scores, grades and algorithm

As a user I would like to be able to define and use in Info360 Asset my company's CCTV inspection standard. This would include user defined CCTV inspection codes, scores, grades and algorithm
Tony Andrews 8 months ago in Info360 Asset / Inspections 0 Gathering support

Multiparameter Risk Analysis 3 or more parameters

User wants to score pipes based on: 1- Proximity to a spatial layer. 2- Diameter 3. Depth And different combinations of each.
Martha Nunez 9 months ago in Info360 Asset / Risk Analysis 0 For Review

Provide Preconfigured Rehab Decision Tree Logic for Customers to Get Started

No description provided
Mike Maylone almost 3 years ago in Info360 Asset / Decision Tree Canvas 3 On roadmap