Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 250 of 1372

Integration with Maximo

Work order data for risk, rehab, or deterioration modeling
Martha Nunez over 2 years ago in Info360 Asset / Other 4 Gathering support

Integration with Info360 Insight

Integrate sensor data (surcharge?) etc. for risk analysis or rehab.
Martha Nunez over 2 years ago in Info360 Asset / Other 0 On roadmap

Add Snowmelt to InfoDrainage

The addition of SWMM5 snowmelt will make it easier to model LID's in North America which has a lot of snowfall in Canada and the northern USA. Snowmelt can be a significant source of water annually to a LID or SuDS.
ROBERT DICKENSON over 2 years ago in InfoDrainage / Hydrology 1 Under consideration

Integration with Cityworks

Integrate with Cityworks CMMS. Rehab actions from Info360 to Cityworks for scheduling and field execution. Work history from Cityworks for risk analysis
Mike Maylone about 3 years ago in Info360 Asset / Other 0 On roadmap

Realistic Flow in SuDS structures

Realistic flow through bioretention, permeable paving and other SuDS within hydraulic models.
Guest about 3 years ago in InfoDrainage 0 Gathering support

Exceedance Level in Infodrainage

It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for...
Guest about 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Permeable Paving

It would be useful to have a central granular conveyance trench beneath permeable paving to avoid the need for overly deep sub base beneath the road / drive.
Guest about 3 years ago in InfoDrainage 1 Already exists

Import EPASWMM5 Files

Importing EPASWMM5 files for US users would help to streamline the transition from SSA (you can export to SWMM5 from SSA)
Guest about 3 years ago in InfoDrainage 2 Under consideration

InfoDrainage - Split subcatchments option for Laurenson runoff routing method

It is industry best practice to split up the subcatchments in a model into their pervious and impervious areas when adopting the Laurenson (or RAFTS) runoff routing method ie U = 2 and U = 0. The current workflow to achieve this is to setup the mo...
Guest about 3 years ago in InfoDrainage 1 Under consideration

Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer about 1 year ago in InfoDrainage / Other 0 For Review