Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 243 of 1370

Allow underdrains to be displayed in the connection tables and add pipe number to them

It is very difficult to create a quick and logical pipe schedule when pipes such as underdrains are hidden in the SuDS nodes and their upstream invert level needs to be calculated manually. Please add the underdrains to the connection tables with ...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Infiltration Trench using BRE DIGEST 365 method

The software needs to support for designing Infiltration trench method by using “BRE DIGEST 365”. I have checked the comparison between Infodrainage analysis Vs BRE digest 365 (manual calculation) and the results are not matching. Most of the proj...
Guest almost 2 years ago in InfoDrainage / Hydraulics 8 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest almost 2 years ago in InfoDrainage / Hydraulics 1 Already exists

Hydrant Design Flow vs Available Flow!

I don't like the new update, which makes the available flow subject to a velocity constraint. In the previous version, the pressure constraint was on the hydrant flowing, while the design flow would consider the network pressure and pipes. They sh...
Guest 11 months ago in InfoWater Pro / Engine 0 For Review

Correct resizing of pop-up windows activated through C3D toolbar

Due to issues with my eyesight I use the accessibility settings on my computer to increase the standard text sizes for applications. When using the InfoDrainage toolbar in Civil 3D pop-up menus don't resize to match the updated display settings. I...
Michael McWhinnie about 1 year ago in InfoDrainage / Other 0 For Review

Microdrainge to Revit

Make Pipes and Inlet available in Revit
Guest about 3 years ago in InfoDrainage 0 Gathering support

Switch design return periods when running cascade analysis

I would like to be able to build a single cascade model & able run it for various design return periods instead of needing to create separate cascade models for each return period.
Guest about 3 years ago in InfoDrainage 1 Already exists

Status Bar to report more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Guest about 3 years ago in InfoDrainage 1 Already exists

Support Biodiversity net gain

Support the ability to create a biodiversity metric for SuDS structures as per the Defra tool.
Guest about 3 years ago in InfoDrainage 1 Gathering support

Link to InfoAsset Asset Management Software

Add a link to take drainage design data into Innovyze's InfoAsset Asset Management Software to complete the cycle of design - build - manage - maintain cycle.
Guest about 3 years ago in InfoDrainage 1 Will not implement