Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 21 of 1370

Open/Closed Valve Control - Live Data

When using an open/closed valve, setting a time profile to describe the opening and closing pressures, it would be useful to be able to load values form Live Data. It should be possible to connect the valve to 2 different live datas: one live data...
Paolo Boiardi over 1 year ago in InfoWorks WS Pro / Engine 0 For Review

In some types of elements the result of the simulation between consecutive time step are very different (oscillations).

Simulation results very differents between consecutive calculation times in series or cascade regulation elements; such as, pressure regulating valves (PRV), float valves (FLV), pumps, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 2 Already exists

Insufficient channel modeling

Impossibility of simulating the operation of a "real" channel with different sections created by different cameras: derivation, shipones, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 0 In progress

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Making a run in WS/WSpro now a (big) list of yellow warnings pop up. By using an optional selection of (run)validation items not anymore

Making a run in WS/WSpro the input always gets fully validated including items not used. Those items creates a (big) list (e.g. 81.273) of yellow warnings. Besides run/validation time causes this a list of not wanted necessary warnings which makes...
Jeroen Fietje over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

As a user of InfoWorks WS PRO, I would like to better simulate FMV valves

In InfoWorks WS PRO is possible to simulate FMV valves, but I would like to introduce a "deviation" option to better simulate it. I give an example: imagine a valve whose pressure setting is 2 Bar if flow is from 0 to 10 L/s, and 2.5 Bar if flow i...
Paolo Boiardi over 2 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

As a user of InfoWorks WS PRO, I would like to better simulate FMV valves

In InfoWorks WS PRO is possible to simulate FMV valves, but I would like to introduce a "deviation" option to better simulate it. I give an example: imagine a valve whose pressure setting is 2 Bar if flow is from 0 to 10 L/s, and 2.5 Bar if flow ...
Paolo Boiardi over 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration