Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 246 of 1370

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest over 2 years ago in InfoDrainage / Other 1 Gathering support

Open/Closed Valve Control - Live Data

When using an open/closed valve, setting a time profile to describe the opening and closing pressures, it would be useful to be able to load values form Live Data. It should be possible to connect the valve to 2 different live datas: one live data...
Paolo Boiardi over 1 year ago in InfoWorks WS Pro / Engine 0 For Review

In some types of elements the result of the simulation between consecutive time step are very different (oscillations).

Simulation results very differents between consecutive calculation times in series or cascade regulation elements; such as, pressure regulating valves (PRV), float valves (FLV), pumps, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 2 Already exists

Insufficient channel modeling

Impossibility of simulating the operation of a "real" channel with different sections created by different cameras: derivation, shipones, ...
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Engine 0 In progress

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support