Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 125 of 1370

INTERLIS format importer of XML data for CCTV and Manhole Survey data

Support the importation of INTERLIS format XML data of CCTV and Manhole Survey data
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Optimize PRV Settings, including flow modulated PRVs

I want a tool that can help define the minimum pressure setting at a PRV to provide required pressure to downstream customers under expected demands. In addition, in cases where I have flow modulated PRV's, I want the tool to provide a curve of pr...
Guest about 4 years ago in InfoWorks WS Pro / Automation 0 Gathering support

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

Available flow capacity analysis with relative pressure drop tolerance

We want to evaluate how much additional demand flow can be pulled from each node independently, while ensuring that no node or customer in the system drops by more than 1 meter of minimum pressure.
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Automation 0 Gathering support

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Allow radio buttons to be unchecked

Allow users to uncheck a radio button if it has been accidentally checked
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review