Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 186 of 1370

Labeling manhole and pipe IDs in the Map

It makes it easier to QAQC data, or simply determine which asset it being viewed in the Map.
Martha Nunez about 2 years ago in Info360 Asset / Data Management 3 On roadmap

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez about 1 year ago in Info360 Asset 1 Gathering support

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis over 1 year ago in Info360 Asset / Data Editing 1 In progress

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez over 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

User defined CCTV inspection codes, scores, grades and algorithm

As a user I would like to be able to define and use in Info360 Asset my company's CCTV inspection standard. This would include user defined CCTV inspection codes, scores, grades and algorithm
Tony Andrews 8 months ago in Info360 Asset / Inspections 0 Gathering support

Multiparameter Risk Analysis 3 or more parameters

User wants to score pipes based on: 1- Proximity to a spatial layer. 2- Diameter 3. Depth And different combinations of each.
Martha Nunez 9 months ago in Info360 Asset / Risk Analysis 0 For Review