Showing 85 of 1370

Automated Skeletonization of models to increase simulation speed

Hydraulic sewer models are becoming increasingly more complex to understand a range of issues. This is ok for short duration simulations, however regulators require us to understand long term performance i.e. simulate 10yr datasets. For large mode...
Tom Walker over 1 year ago in InfoWorks ICM / InfoWorks 10 Gathering support

Tools to clean up networks using the SWMM engine.

At the moment, the inference tools only work in a Wallingford network, and no tools are available in a SWMM network.
Guest about 2 months ago in InfoWorks ICM / SWMM 2 Will not implement

Feature request for bulk delete of scenarios

I would like to request a feature that allows users to delete multiple scenarios at once within a single model network. After creating a base model in the model network, users often generate multiple scenarios to explore different countermeasures ...
Nami Ikarashi 4 months ago in InfoWorks ICM / Scenario 8 Under consideration

Support for ArcEngine Functions for background layers (no x32 bit support)

The current x64 version of ICM cannot use the ArcEngine / ArcGIS Desktop funcionality, in contrast to previous x32 bit versions of ICM. Since only x64 bit version is now supported, this feature cannot be used. It is one of the most important featu...
Elliot Egan about 2 years ago in InfoWorks ICM / GIS Layers 1 In progress

possibility to connect labels to links at the beginning or end instead of only in the middle of the link

This way you can show that link invert levels on a manhole differ in value or deviate from the chamberfloor
Loes van der Linden 10 months ago in InfoWorks ICM / Labels 3 Already exists

Themes to include robust SQLs

Can we enhance conduit theming using robust SQL queries? We're aiming to apply themes based on the mean of minimum upstream and downstream velocities in each conduit over the TSR simulation. Considering the multiple scenarios involved in system de...
Parameswara Rao Narra 5 months ago in InfoWorks ICM / Theme 4 Already exists

More tools for geometry manipulation

When building networks with multiple similar sections, it would be incredibly useful to have more tools for manipulating the geometry of selected objects, primarily a rotation tool and an invert/flip tool (e.g. swap the orientation of the nodes ei...
Guest 4 months ago in InfoWorks ICM / InfoWorks 1 Gathering support

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Commit history for scenarios

Commit history for scenarios Show an extra column in the commit history window to indicate how many scenarios exist in this version of the network. Ideally, there would be a button or column through which you can see the names of the scenarios for...
Annemie Vermeulen about 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Need for flexible rainfall assignment in 2D zones

In models created using ICM by Japanese users, it is not uncommon for both approaches—one where rainfall is applied to subcatchments and flood from the network flows over 2D elements, and another where rainfall is applied directly to the 2D zone—t...