Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 146 of 1442

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley about 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Manager - Double the quantity of user fields for all objects.

I often run out of user fields especially on pipe objects. It would be very beneficial to have extra fields available.
Jim O'Dowd over 2 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest over 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

Increased number of user pollutants

We would like to be able to trace pollutant sources through our 2D model. The way to do this would be to use the user defined pollutants . But... at the moment there are only four pollutants and potentially we'd have many different sources that we...
Richard Body over 5 years ago in InfoWorks ICM / Pollutants / Water Quality 1 Gathering support

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

As a user, I would like the CCTV survey import tool to identify when the Pipe Segment Reference/Pipe ID is inaccurate.

Currently, when importing CCTV inspection data, InfoAsset Planner looks for the inspection based upon Upstream and Downstream assets. If it finds a match, it does not check if the pipe segment reference/facility ID match as well. It only checks th...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 Gathering support

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest over 3 years ago in Other Product Ideas / Asset Management 5 For Review

Storage area polygons

Storage nodes often represent detention basins or other locations with large areas. Pipes enter/leave from opposite sides. With the standard link/node configuration, one or more link will be mis-configured compared to the actual location. I have...
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 2 Gathering support