Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 338 of 1370

Inclusion of FEH UK Rainfall Data

Can FEH rainfall data (all versions) be available to select just like it is for FRS data in the rainfall manager rather than having to retrieve these from another website. More and more authorities are asking for FEH data to be used
Guest about 1 year ago in InfoDrainage / Rainfall 1 For Review

Results tool tips for 2D Zone

Interactive tooltip appear to be missing 2D Zone element results...
Guest about 1 year ago in InfoWorks ICM / 2D Flooding 1 Under consideration

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest over 2 years ago in InfoDrainage / Other 1 Gathering support

Revision to manhole representation

ICM's default representation of manholes could be more accurate. The limitations of current setup allows accurate representation of either the shaft or the benching but not both. Thus most people tend to apply chamber areas to invert which overest...
Guest almost 4 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

RTC - Allow data to be pasted into tables and it automatically generate the rows

The only way to add new rows to an RTC Table is to manual click on them - if would be better if you could paste a large number of rows from Excel and it auto-generates the rows in the same way as when pasting data into the Inflow table.
David Beesley almost 3 years ago in InfoWorks ICM / RTC 0 Gathering support

Improvement on the Numerical Correction Process in ICM

The current procedure for ‘Numerical Correction’ in ICM requires users to remove any existing values to calculate the correction (for Preismann and Base flow) before the inbuilt routine is run. If this wasn't made the calculated correction values ...
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support