Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1370

Improvement on the Numerical Correction Process in ICM

The current procedure for ‘Numerical Correction’ in ICM requires users to remove any existing values to calculate the correction (for Preismann and Base flow) before the inbuilt routine is run. If this wasn't made the calculated correction values ...
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Different symbology for different defect types

In the initial release all observations are in a single layer. If we can break these out into continuous observations/defects, point defects, and connections that would be great. Specifically connections as stub outs are very impactful to customer...
Tim Medearis over 4 years ago in Info360 Asset / Customization / Styling 0 Gathering support

I&I Processing of Gravity Collection and Vertical Lift Stations

To be able to take I&I volumes or volume/diameter/foot electronic calculated tags from Info360 and process the R&R (i.e. CIPP lining, replacement, re-grout, CCTV, electroscan inspections, etc.) actions within Asset's Rehabilitation plan.
Guest over 4 years ago in Info360 Asset 0 Will not implement

Option to adjust the opacity/transparency of the ‘Satellite’ base layer

It is really useful to use that base layer sometimes but it also means it is difficult to see the asset/GIS layers without then changing the style of the layers. Darker colors tend to show up well on the ‘Streets’ basemap but light colors are more...
Guest about 3 years ago in Info360 Asset / Customization / Styling 1 Gathering support

Ability to publish Model results to Info360 with access via API

This is something for Insight as well as modelers that have neither.As a modeler (InfoWater Pro, InfoWorks ICM, etc.) I want to publish selected model results to Info360 for multiple uses: Share summary result values to Asset data (e.g. average fl...
Nathan Gerdts over 4 years ago in Info360 Asset / Data Management / Integrations 0 Gathering support

Ability to resize node layers in the map.

This is a spatial symbology enhancement to what has already been implemented. Alter the node size in the theme tool
Guest about 3 years ago in Info360 Asset / Customization / Styling / Layer Panel 0 Gathering support

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Gathering support

Integration and visualization of Electroscan data

Electroscan data is a condition assessment technology that uses current readings to detect potential infiltration and inflow defects along the length of the pipe. The current vs length readings can be displayed in a plot diagram in InfoAsset Plann...
Martha Nunez over 1 year ago in Info360 Asset / CCTV Standards (e.g. PACP) 0 Gathering support

Dashboard Not for Just Asset Module, but for part of Info360.com so KPI across multiple modules can be seen in one place.

It seems like each module is developing their own dashboard. This to me is an issue, as it violates the very definition of an integrated system and a Dashboard. People only want one Dashboard to look at. The Dashboard should be a feature in the In...
Guest almost 5 years ago in Info360 Asset 0 Will not implement

Calculation of Pump Power in ICM

A pump curve and energy/efficiency curve can be input into the software however there is no way to output the energy used by the pump. South Gippsland Water were keen on understanding whether ICM could do this to report their energy efficiency bas...
Ann Pugh almost 5 years ago in InfoWorks ICM / Pumps 0 Gathering support