Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 180 of 1370

Innovyze License Administrator

New license administrator is terrible compared to the previous one.
Michael Wetterau about 3 years ago in InfoWater Pro 0 Will not implement

Add Live Modeling

Understand and manage water distribution networks better. Add live modeling to incorporate real-time performance data. Model water quality and age. Configure live alerts so operators can quickly see what areas need attention.
Guest over 3 years ago in InfoWater Pro 1 Will not implement

Image Import Information: File Types and Sizes

Would like to see the list of accepted file types (SVG, PNG, JPEG, PDF, etc.) , and file size limitations.
Amelia over 3 years ago in InfoWorks ICM / GIS Layers / Import data 0 Gathering support

ICM - Import of .XP files

Current workflow for importing a XPRAFTS or XPSWMM/XPSTORM model into ICM is to export the XP model to a .XPX file. This is problematic as a user will need to own a XP licence to complete this step and is not always the case. This is particularly ...
Guest over 3 years ago in InfoWorks ICM / Import data 1 Will not implement

Default Symbol and Map Display

Please allow the option to choose the default symbol (InfoWater Model Preferences) and Map Display symbol from the "Styles" built into ArcGIS Pro. Both ESRI and my company have custom .stylx files that house our custom symbols for points, polyline...
Joe Lawrence over 4 years ago in InfoWater Pro 1 Gathering support

Allow the InfoWater Pro "Live Data Adapter" to use non-live data

The Live Data Adapter can be a powerful tool for calibrating models, but is difficult to set up. Many times, you don't have permission to connect to the SCADA historian database. Right now, it only supports ClearSCADA, PI, SQL Server, and Oracle, ...
Colin Ricks over 4 years ago in InfoWater Pro 0 Gathering support

Display Warnings when Tank Stage/Volume Curve Inconsistent with Levels

As far as I can tell this is an EPANET bug, but say your tank levels are set to minimum 4 and maximum 20. If you have a stage/volume curve that goes below 4, your tank will supply water forever from a level of 4 feet.
Guest almost 5 years ago in InfoWater Pro 1 Already exists

Bring back the pause button for calculation.

In one of the first version of Infoworks there was a pause button for calculation. We have some big calculations who mostly run at nighttime. Sometimes the run is so big it still runs in the morning. The only thing we can do is stop the calculatio...
Erik Amting almost 5 years ago in InfoWater Pro 0 Will not implement

I want to be able to customize the minor loss table for pipe networks.

It would be nice if the user could modify the minor loss table for pipes. Whether it be changing the minor loss values, deleting, or editing the existing values. Since we all have our own resource we typical reference for these values, it would be...
Guest almost 5 years ago in InfoWater Pro 1 Gathering support

CAM Enhancement

CAM Enhancements A few things to consider that I think would make your tool better than others I have seen/used: 1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in ...
Guest about 5 years ago in InfoWater Pro / Engine 0 Under consideration