Attach reports (pdfs) to asset

We sometimes get inspection data in a pdf format and other times we may have a write up on the condition of the asset. It would be useful to attach this to the asset.
Lauren de Bude 9 months ago in Info360 Asset / Import / Upload 1 Gathering support

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts 6 months ago in InfoWorks WS Pro / Operations 1 Gathering support

PACP v8 Compliance for InfoAsset Manager and Info360 Asset

Version 8 was released in early 2024. It includes pressure pipe assessment codes. This grading system would be a significant improvement to the PACP7 compliance which, while still popular, is 7 years old. NASSCO has sunset version 6, and no longer...
Tim Medearis almost 2 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 2 Gathering support

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez almost 3 years ago in Info360 Asset / Query types / Capabilities 1 Under consideration

Upstream and Downstream Trace Icons are misleading

Minor annoyance here and possible solution- can you change the icons for the upstream and downstream trace to actually be meaningful? at the moment both icons represent downstream and upstream trace at the same time and it doesn't make sense
Daniel Alexander 9 months ago in InfoWorks WS Pro / Other 1 Gathering support

Provide Preconfigured Rehab Decision Tree Logic for Customers to Get Started

No description provided
Mike Maylone about 3 years ago in Info360 Asset / Decision Tree Canvas 3 On roadmap

Split CCTV inspections when a manhole gets installed

This should be done in cases where a pipe gets split into two assets because a manhole was installed along the length of the original asset. The CCTV inspection would have to be 'split' into two inspections to accurately represent the condition da...
Martha Nunez over 2 years ago in Info360 Asset / Data Editing 0 On roadmap

Expand Primary Key Fields to Support UUIDs

It would be helpful to use UUIDs as primary/secondary key fields for row objects for data exchange with other GIS databases. It could also be a better way of generating new IDs than the default approach of sequential numbers, which cause problems ...
Dave Watts 10 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Quick view graph docked in Results Properties Panel

When reviewing models, I want a quick view graph of any selected object in a docked location to review. The results Properties Panel could be a potential location. I want to be able to switch through to select which output is being displayed on th...
Nathan Gerdts 10 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Live integration with ArcGIS Online

When updating a risk and rehabilitation model, users would like to make sure the data they are using is up to date. Much of this data such as roads, parcels, waterbodies, etc. comes from their GIS systems which get updated quarterly, semi-annual, ...