Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 310 of 1372

InfoAsset Planner - Allow "Batch Run" in Data Miner

Allow "Batch Run" in Operation Center/Data Miner tab (same as allowed in Operation Center/Analysis/Tools/Batch Run). At the moment if you need to update the Data Miners they must be individually right clicked, select Run, close the automatically ...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Play Sewer TV a standard multipliers (2x, 4x, 10x)

I want to use standard video scaling multipliers to rapidly view inspection videos. Suggested video multipliers 2x, 4x, 10x faster than the recorded speed.
Guest almost 5 years ago in Other Product Ideas / Asset Management 0 For Review

Inclusion of FEH UK Rainfall Data

Can FEH rainfall data (all versions) be available to select just like it is for FRS data in the rainfall manager rather than having to retrieve these from another website. More and more authorities are asking for FEH data to be used
Guest about 1 year ago in InfoDrainage / Rainfall 1 For Review

View model results in InfoAsset Manager

As a user I would like to be able to see hydraulic model results in InfoAsset Manager
Guest about 6 years ago in Other Product Ideas / Asset Management 2 Gathering support

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest over 2 years ago in InfoDrainage / Other 1 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

InfoAsset Online - "Sort by the date" option in selection grid

If there is a way to put the surveys which are part of a Work Package search into date order, It would be beneficial to our users. Some of our jobs involve several visits and it would be better for the user to be able to see the latest surveys at ...
Guest over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review