Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 310 of 1372

manhole and pipe size files

when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file
Guest about 3 years ago in InfoDrainage 1 Gathering support

Conduit Numbering

I have encountered a glitch with the conduit numbering system. While manhole numbering works as expected (check the snip), the conduit numbering is generating inconsistent formats as expected such as CO-1.001, CO.1002, and so on Our expectation is...
Jana Anbu 8 months ago in InfoDrainage / Productivity 2 Already exists

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration

ILSAX Runoff Method

ILSAX is a public domain MS-DOS program developed from the South African ILLUDAS-SA program, which was itself a development of the American ILLUDAS program and the British Transport and Road Research Method (known as the TRRL or RRL model). It was...
matthew.piggott over 1 year ago in InfoDrainage / Hydrology 1 Gathering support

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT over 2 years ago in InfoDrainage / Other 1 Gathering support

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review