Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Open/Closed Valve Control - Live Data

When using an open/closed valve, setting a time profile to describe the opening and closing pressures, it would be useful to be able to load values form Live Data. It should be possible to connect the valve to 2 different live datas: one live data...
Paolo Boiardi over 1 year ago in InfoWorks WS Pro / Engine 0 For Review

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest almost 5 years ago in Other Product Ideas / Asset Management 1 For Review

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood over 6 years ago in Other Product Ideas / Asset Management 0 For Review

Different symbology for different defect types

In the initial release all observations are in a single layer. If we can break these out into continuous observations/defects, point defects, and connections that would be great. Specifically connections as stub outs are very impactful to customer...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling 0 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith almost 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest over 6 years ago in Other Product Ideas / Asset Management 1 For Review

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

Option to adjust the opacity/transparency of the ‘Satellite’ base layer

It is really useful to use that base layer sometimes but it also means it is difficult to see the asset/GIS layers without then changing the style of the layers. Darker colors tend to show up well on the ‘Streets’ basemap but light colors are more...
Guest over 3 years ago in Info360 Asset / Customization / Styling 1 Gathering support

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis about 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Under consideration