Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

I want a Gully Space calculations tool in InfoDrainage

InfoDrainage - want to do Gully space calculations or assess capacity of different gullies. can you add the gully design tool to InfoDrainage?
Guest over 3 years ago in InfoDrainage 1 Under consideration

Catchment area in different colour

currently the catchment area demarcation gives only a common colour at all area. we need to allow catchment area in different colors to demark Paved, unpaved, Road in details while we represent the details to client
Guest about 2 years ago in InfoDrainage / Visualization 1 Gathering support

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer almost 2 years ago in InfoDrainage / Hydrology 2 For Review

Export non-connected catchment objects

Currently Civil 3D will not export a catchment object unless is connect to a structure/junction. It should export all catchment objects regardless of if they are connected to a structure/junction.
Guest over 1 year ago in InfoDrainage / Hydrology 0 For Review

Cross Section view of channels/weirs

Some hydraulic analysis reports require a cross section view of HGLs/EGLs of weirs, channels, or ponds. See attached image.
Tim Medearis about 1 year ago in InfoDrainage / Visualization 0 For Review

Multiple fixed tailwater elevations

Currently, the software allows users to set only one fixed tailwater elevation per outlet. However, users need the ability to set different fixed tailwater elevations for different storm events (e.g., 10-year, 25-year, 100-year storms).
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Add a storage structure feature for channel drains

Add a storage structure feature for channel drains (e.g. channel, slot drain, kerb drain) so that these features can be presented as storage and not only conveyance (by modelling a custom section) and so that catchments can be connected as a sheet...
Oliver Dodd over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Tariff Scheduling

Energy tariffs in water and wastewater treatment plants are often defined hourly by an energy operator. This correspondingly defines low- and high- tariff periods. When a customer desires to track energy consumption and estimate its cost through I...
Javier Coronado about 1 year ago in Info360 Insight / General 0 For Review

Analytics and Workplaces Ownership

When multiple users work in parallel, it is key to trace work changes. For example, if user A creates an analytic that must later be modified by user 2, both user2 and user1 must be aware of creation and modification ownership. This becomes critic...
Javier Coronado about 1 year ago in Info360 Insight / General 0 Under consideration

Show preliminary sizing estimated flow depth in profile view.

The proportional depth is given in the Network Design Report but not shown in the long sections. This is a very useful feature to allow quick checking of throttling or spare capacity in the network.
Matthew Johnson over 1 year ago in InfoDrainage / Hydraulics 0 For Review