Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 142 of 1370

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Simple Criticality Assessment Manager reporting in InfoWater Pro

I want a simple report for each pounded area between valves, reporting the length of pipe affected, number of customers, number of critical customers, amount of demand taken offline by isolation, and possibly the total volume of demand lost betwee...
Guest about 5 years ago in InfoWater Pro 0 Under consideration

I would like to create a template for model import from GIS to XPSWMM

When you go exchange data from GIS to XPSWMM you need to find all the fields you want each time and rename all the field for GIS compatibility. I would like to create a standard template once and use that template for each model and each time I ne...
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

As a user, I would like to be able to export node max stage for all different global storms when exporting to GIS in XPSWMM.

When exporting results to GIS, it should export all the storms that are selected, so that I don't need to manually extract the information and piece them together.
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

I would like more informative error messages when trying to Change an ID

I tried to change the ID for a pump, but I overlooked the “Target Element Type” dropdown, which was automatically set to junction. It took me a while to realize my mistake. It might be helpful to other users if the error messages/warnings (see be...
Guest over 5 years ago in InfoWater Pro / Productivity 0 Gathering support

InfoWater for QGIS

ArcMap and ArcGIS Pro are expensive and slow. QGIS is free and fast.
Colin Ricks over 5 years ago in InfoWater Pro 0 Will not implement

It would be great to add PMP (probable maximum precipitation) calculator to XPSWMM and XPSTORM

It would be great to add PMP (probable maximum precipitation) calculator to XPSWMM and XPSTORM
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Interface Utility export efficiency

Can I make a suggestion regarding the InterfaceUtils.exe utility? Seeing that we are now dealing with considerably more rainfall data associated with ARR2016/2019 rainfall & temporal patterns, can Innovyze (or whoever created the abovementione...
Guest almost 6 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Add multiple rows to the InfoWater "Rule Header" DB table

In the "Pipe Control" or "Node Control" DB tables, I can insert or append multiple rows at once. In the "Rule Header" DB table, I can only insert or append one row at a time, and each row must have an ID. Please make the behavior of this table co...
Colin Ricks almost 3 years ago in InfoWater Pro 0 Under consideration