Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 7

Support for multiple screens

I would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Guest over 5 years ago in InfoWorks WS Pro 1 Will not implement

Option to display in the same time assignments of properties to nodes and to pipes

Add an option to map to display in the same time assignments of properties to nodes and to pipes. At the moment it is not possible as the 'Customer Point Demand Assignment' option is a radio button.
Guest almost 5 years ago in InfoWorks WS Pro 1 Will not implement

I want to be able to see what connected Agents are doing and trouble shoot connections from within WS Pro

A command centre program for WS Pro/IWLive runs which shows connected agents and marshallers and all the runs in a simulation workgroup in one place. Better simulation workgroup diagnostics. I am trying to trouble shoot remote VPN issues and the ...
Ann Pugh almost 5 years ago in InfoWorks WS Pro 0 Will not implement

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

As a user it is good to allow tab windows to take it out to the second or third display

Tab windows are not allowed to move main window to second display.
Guest about 4 years ago in InfoWorks WS Pro 0 Will not implement

I have been testing your export features using a number of simulation results with a selection set. This does not work as it is supposed to

Results export to CSV does not work with selection sets, it always just exports all of the network
Guest over 4 years ago in InfoWorks WS Pro 0 Will not implement

allow multiple selection lists in a shutdown simulation

I am currently working on a long-term planning of our pipeline renovation projects. I need to determine which projects can be executed simultaneously. My approach at this time is to create a selection list of all the pipes that would be taken out ...
Guest almost 5 years ago in InfoWorks WS Pro 0 Will not implement