Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 5 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Intpret the control logic from available data

As a hydraulic modeler supporting a digital twin, I want Info360 to infer my pump station control logic based on available data like tank levels, upstream/downstream pressures, etc.
Nathan Gerdts about 2 years ago in Info360 Insight / Pump Stations 0 Under consideration

Share Workspace/Analytic with other users

Add a Share button. Add the feature to share workspaces and analytics with other users. This can foster collaboration and improve adoption.
Basem Guirguis over 2 years ago in Info360 Insight / Forms / General / Pump Stations / Reports / Workspaces 0 Under consideration

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap