Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 5 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap

Add maintenance as a type of incident

It would be useful if 'maintenance' was added as an incident type to allow sensor maintenance to be captured in Insight. This is applicable for a service provider installing sensors and monitoring a network on behalf of a client.
Brad Thompson over 2 years ago in Info360 Insight / Incident Manager 0 Under consideration

Publish InfoWorks WSPro critical link analysis module results to Info360 Insight - Incident Manager (building on work done in Info360 Asset)

With the InfoWorks WSPro Critical link analysis module results being made available within Info360 Asset for criticality/risk calculations - these results could potentially be valuable to operations in an incident or pipe break scenario (number of...
Patrick Bonk about 2 years ago in Info360 Insight / Incident Manager 0 Under consideration