Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 348 of 1370

Limit InfoWater Pro Results Output for External Applications to Certain Runs

Currently, when using the "EXT_APP_FILTER" setting to output results in .dbf format for selected elements, .dbf files are created for every single scenario that is run, although the .dbf output files might not be needed for all scenarios. This unn...
Christene Razafimaharo over 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Report volume stored in all tanks

I can calculate volume from level, but it's an extra step and requires that I copy the run results out to Excel. It's even more difficult if I have a non-circular tank. Please include tank volume in the tank results and in the "System Demand" report.
Colin Ricks about 5 years ago in InfoWater Pro / Productivity 1 Gathering support

Zoom to domain when inactive facilities selected

When inactive facilities are included in the domain, clicking the "Zoom domain" button only zooms to the extent of the active facilities in the domain. If only inactive facilities are part of the domain (no active facilities at all), then this but...
Colin Ricks over 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks almost 6 years ago in InfoWater Pro / Other 3 Under consideration

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence over 4 years ago in InfoWater Pro 1 Gathering support

Include an "excluded search nodes" warning in fireflow output table

When the design pressure exceeds the static pressure at a particular node, that node will be excluded from a design fireflow model run. The output table should include a banner at the top listing the excluded nodes, as these can make a big differe...
Guest over 4 years ago in InfoWater Pro / Engine 0 In progress