Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 349 of 1370

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest about 6 years ago in Other Product Ideas / Asset Management 1 For Review

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support

Allow SOIL values < 0.15

The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15. The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1 This produces a significant difference in results. This difference results from u...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Design settings which only allows backdrops in pipe diameters below 225mm diameter

No description provided
Guest about 3 years ago in InfoDrainage 0 Gathering support