Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 343 of 1372

Add Simple Index Approach tool to InfoDrainage

It would be good if we we can get the "Simple Index Approach" tool inside InfoDrainage.
Dilraj KT over 2 years ago in InfoDrainage / Other 1 Gathering support

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest about 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Enable time fields to be used in calculated value

For numeric user defined object fields set to time allow them to be used in the calculated value function in Mobile forms
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Allow radio buttons to be unchecked

Allow users to uncheck a radio button if it has been accidentally checked
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Limit the number of check boxes able to be checked

Enable users to put a cap on the number of check boxes that can be checked
Lianne Rose 10 months ago in Other Product Ideas / Asset Management 0 For Review

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest about 3 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest about 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest about 3 years ago in InfoDrainage 0 Gathering support