Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 4 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 4 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap