Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 5 of 1370

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 4 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg over 1 year ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

Add the Condition component option (from CCTV) as an option to be used under new categories.

This would be useful for users that want to have a separate category for one of the Condition fields (structural peak score, service score, etc). The reasoning is that we way that it is right now it forces the condition component to be depending o...
Martha Nunez about 4 years ago in Info360 Asset / COF & LOF Categories / Components / Risk Configuration / Calculation 0 Gathering support

Access real-time KPI's from Info360 for LOF's and Risk

For assets with sensors (e.g. pumps), time series KPI's can provide the best current point of truth on the condition of the asset.e.g. Analytics can report actual efficiency of pump performance so prioritization can be assigned for areas with grea...
Nathan Gerdts about 5 years ago in Info360 Asset / COF & LOF Categories / Components 0 Gathering support

Risk & Rehab Based On MSCC Condition Scoring

Use condition scores for MSCC inspections risk models and rehab queries. This will allow UK utilities to do condition analysis in Info360 Asset.