Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 11

Incorporate the NZ Pipelines Inspection Manual 4th Edition into Info360 Asset

We currently use InfoAsset to record our CCTV inspections and we rely on the NZ Pipelines Inspection Manual 4th edition for the scoring. We are interested in migrating across to Info360 Asset but until this has been incorporated into the product w...
Guest 10 months ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

PACP v8 Compliance for InfoAsset Manager and Info360 Asset

Version 8 was released in early 2024. It includes pressure pipe assessment codes. This grading system would be a significant improvement to the PACP7 compliance which, while still popular, is 7 years old. NASSCO has sunset version 6, and no longer...
Tim Medearis almost 2 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 2 Gathering support

Lateral inflows from event data for rivers

Currently it is possible to add lateral inflows to a river via subcatchments, if we could also do this directly from event data or TSDB that would be great.
Guest about 6 years ago in InfoWorks ICM / Events / Flow / Hydraulics 0 Gathering support

Recurring inflow files for different days

the present Inflows to a node or pipe require a specific date and time for each sub-event and are not recurring. This will lead us to input the same data over and over again. If we had a recurring inflow profile that allow us to create inflows fo...
Indresh Narayanaswamy over 2 years ago in InfoWorks ICM / Flow 0 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez about 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 Gathering support

Implement the Inflow Time Series Scaling Factor in InfoWorks from ICM SWMM

Scale Factor In ICM SWMM or SWMM5 a multiplier is used to adjust the values of the constituent's inflow time series. The scale factor can have several uses, such as allowing one to easily change the magnitude of an inflow hydrograph while keeping ...
Robert Dickinson about 2 years ago in InfoWorks ICM / Flow 0 Gathering support

Inflow files with different timesteps or ability to import multiple inflow files to a Run file.

For inflow files, sometimes you have 15-min data for one gauge, and 5-min data for another location, and you want to import them both to the model. It would be helpful to be able to import inflow files with different timesteps for the same date ra...
Guest over 3 years ago in InfoWorks ICM / Flow 0 Gathering support

Field for CCTV scoring standard used

Need a field to display the standard used to score the approved survey. It should say 'NASSCO PACP v6' or 'MSCC' and all the other defect standards. Right now there is no field so you can't tell whether a pipe inspection was scored using PACP v6 o...
Tim Medearis over 4 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Integration and visualization of Electroscan data

Electroscan data is a condition assessment technology that uses current readings to detect potential infiltration and inflow defects along the length of the pipe. The current vs length readings can be displayed in a plot diagram in InfoAsset Plann...
Martha Nunez almost 2 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 0 Gathering support

Theme the location inflow points

Would it be possible to add a feature in ICM which highlights the locations where inflows are being applied to the model, when they are selected in a boundary file. There are many occasions where there are numerous point or lateral inflows to rive...
Guest over 2 years ago in InfoWorks ICM / Flow 1 Gathering support