Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 235 of 1370

Improve Snap Marker visibility

Improve the Snap marker visibility as they blend into the object making the snap markers nearly invisible
Guest about 3 years ago in InfoDrainage 1 Already exists

Output to 2D CAD to have option of what units to export in.

When using the output to CAD function often when opening the file it says its in inches or ft. It would be good to have the option to change this to m or mm.
Guest about 2 years ago in InfoDrainage / Data Exchange 1 Gathering support

Robust pond editor

Add options for complex pond shapes and items. Many municipalities now require items like latorial shelves, forebays, baffles, etc. these items do influence the detention time in the pond and can have effects on staging. While the size items can b...
Corey Balenger about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Inclusion of FEH UK Rainfall Data

Can FEH rainfall data (all versions) be available to select just like it is for FRS data in the rainfall manager rather than having to retrieve these from another website. More and more authorities are asking for FEH data to be used
Guest about 1 year ago in InfoDrainage / Rainfall 1 For Review

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest over 2 years ago in InfoDrainage / Other 1 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support