5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Different symbology for different defect types

In the initial release all observations are in a single layer. If we can break these out into continuous observations/defects, point defects, and connections that would be great. Specifically connections as stub outs are very impactful to customer...
Tim Medearis over 4 years ago in Info360 Asset / Customization / Styling 0 Gathering support

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Option to adjust the opacity/transparency of the ‘Satellite’ base layer

It is really useful to use that base layer sometimes but it also means it is difficult to see the asset/GIS layers without then changing the style of the layers. Darker colors tend to show up well on the ‘Streets’ basemap but light colors are more...
Guest about 3 years ago in Info360 Asset / Customization / Styling 1 Gathering support

Ability to resize node layers in the map.

This is a spatial symbology enhancement to what has already been implemented. Alter the node size in the theme tool
Guest about 3 years ago in Info360 Asset / Customization / Styling / Layer Panel 0 Gathering support

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support

Allow SOIL values < 0.15

The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15. The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1 This produces a significant difference in results. This difference results from u...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Design settings which only allows backdrops in pipe diameters below 225mm diameter

No description provided
Guest about 3 years ago in InfoDrainage 0 Gathering support