Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 12 of 1370

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg over 1 year ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Add the Condition component option (from CCTV) as an option to be used under new categories.

This would be useful for users that want to have a separate category for one of the Condition fields (structural peak score, service score, etc). The reasoning is that we way that it is right now it forces the condition component to be depending o...
Martha Nunez about 4 years ago in Info360 Asset / COF & LOF Categories / Components / Risk Configuration / Calculation 0 Gathering support

Access real-time KPI's from Info360 for LOF's and Risk

For assets with sensors (e.g. pumps), time series KPI's can provide the best current point of truth on the condition of the asset.e.g. Analytics can report actual efficiency of pump performance so prioritization can be assigned for areas with grea...
Nathan Gerdts about 5 years ago in Info360 Asset / COF & LOF Categories / Components 0 Gathering support

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

Risk & Rehab Based On MSCC Condition Scoring

Use condition scores for MSCC inspections risk models and rehab queries. This will allow UK utilities to do condition analysis in Info360 Asset.