Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 17 of 1370

Design ARV & Washout size - Simulate losses & airflow during system drain down

As a planning and design team, we need to size air valves and wash outs for our system so that large pipes can be drained for maintenance in a timely manner. InfoWorks WS Pro models the draindown of water after isolation, but it doesn't take into ...
Nathan Gerdts about 2 months ago in InfoWorks WS Pro / Operations 0 For Review

Multiparameter Risk Analysis 3 or more parameters

User wants to score pipes based on: 1- Proximity to a spatial layer. 2- Diameter 3. Depth And different combinations of each.
Martha Nunez 9 months ago in Info360 Asset / Risk Analysis 0 For Review

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Build your own expression for risk model total risk calculation

Specific request has come in from EPCOR. Requires follow-up As a user, I want to build my own expression when creating a risk model. For example, I want to bias the model myself and then normalize to 100. Total risk = ((LOF * 0.3) + (COF * 0.7)) *...
Mike Maylone over 2 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez over 1 year ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Provide a chart summary for risk models

Create risk summary charts akin to the inspection charts, showing range of risk ratings.
Brad Thompson over 2 years ago in Info360 Asset / Risk Configuration / Calculation 0 Gathering support

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg over 1 year ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support