Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1370

Batch CCTV Video and Photo Import for Info360 Asset

I have been working in the Corte Madera project and have ran into a couple of challenges that although not stop blockers, they are very time and resource consuming tasks. Downloading data provided by client: If a client provides 200GB of data, it ...
Martha Nunez over 4 years ago in Info360 Asset / Import / Upload 0 Already exists

Field for CCTV scoring standard used

Need a field to display the standard used to score the approved survey. It should say 'NASSCO PACP v6' or 'MSCC' and all the other defect standards. Right now there is no field so you can't tell whether a pipe inspection was scored using PACP v6 o...
Tim Medearis over 4 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Add filters to inspection charts

The charts tool, when viewing PACP inspections, currently shows the distribution of scores only. For reporting purposes, it would be nice if some additional parameters could be added. For example, seeing the score distribution across pipe or inspe...
Kim Solberg over 1 year ago in Info360 Asset / Map visualization 1 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support

Allow SOIL values < 0.15

The Rural Runoff estimate tool in MDSUDS does not allow values of SOIL below 0.15. The UKSUDS greenfield runoff tool defaults to a value of SOIL=0.1 where SoilType=1 This produces a significant difference in results. This difference results from u...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Design settings which only allows backdrops in pipe diameters below 225mm diameter

No description provided
Guest about 3 years ago in InfoDrainage 0 Gathering support

Assess scenarios based on annual water balance (runoff, infiltration, evaporation)

Assessment of the annual water balance is an important criteria to evaluate drainage design at neighbourhood level. Functionality to assess scenarios in a chart (similar to typical pre-urban vs. urban) would save time in GIS-postprocessing
Guest about 3 years ago in InfoDrainage 0 Gathering support