Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWater Pro

Showing 13

Incorporate greater flexibility in the creation of UDF maps from the Print Field Journal

The current Print Field Journal for UDF maps does not allow users to adjust the map size (relative to other elements in the PDF), which was an important feature for our client when using UDF with InfoWater (the map is the most important for them i...
Guest 4 months ago in InfoWater Pro / Productivity 0 For Review

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 5 months ago in InfoWater Pro / Other 0 For Review

Hydrant Design Flow vs Available Flow!

I don't like the new update, which makes the available flow subject to a velocity constraint. In the previous version, the pressure constraint was on the hydrant flowing, while the design flow would consider the network pressure and pipes. They sh...
Guest 6 months ago in InfoWater Pro / Engine 0 For Review