Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1403 of 1403

Need for flexible rainfall assignment in 2D zones

In models created using ICM by Japanese users, it is not uncommon for both approaches—one where rainfall is applied to subcatchments and flood from the network flows over 2D elements, and another where rainfall is applied directly to the 2D zone—t...
Nami Ikarashi 6 months ago in InfoWorks ICM / InfoWorks 0 For Review

More flexibility for pdm runs

We would like to be able to simulate warmup and hydraulic simulations with different input sources. Now the run crashes if for example rainfall data does not match the saved state of the warmup run. It would also be very useful to make it possible...
Guest almost 3 years ago in InfoWorks ICM / Hydrology 0 Gathering support

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest almost 3 years ago in InfoWorks ICM / Simulations 0 Gathering support

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang 9 months ago in InfoWorks ICM / Hydraulics 2 Will not implement

Allow export of user flags via ruby

As a WaSC we hold our models in a central model library and need to ensure our default flags are utilised, and the descriptors are not amended. we have automated the comparison as far as possible but the flags within any new Db have to be manually...
Richard Robinson 12 months ago in InfoWorks ICM / Export Data 0 For Review

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

Include parts mapping files for the UKIE country kit by default.

Across the UKIE region many designers will use the UKIE country kit for building Civil3D models, instead of everyone making their own parts map files this could be an integral part of the data exchange between two Autodesk products, included in th...
Guest almost 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Split CCTV inspections when a manhole gets installed

This should be done in cases where a pipe gets split into two assets because a manhole was installed along the length of the original asset. The CCTV inspection would have to be 'split' into two inspections to accurately represent the condition da...
Martha Nunez over 2 years ago in Info360 Asset / Data Editing 0 On roadmap

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 9 months ago in InfoDrainage / Hydrology 0 For Review

Change default field name behaviour when exporting to shape file

When exporting model network data to shapefile format, the default export field names generated in the “open data export centre” are currently very awkward. The issue arises because many field names in ICM are longer than ten characters, but shape...
Jason Kulsdom over 1 year ago in InfoWorks ICM / Export Data 2 Under consideration