Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1403 of 1403

I want to be able to open a layer list using Exchange (Ruby)

As part of a ruby script, I would like to add a specific layer list to a network to enable a Spatial SQL to be run. This script needs to be run on all our networks as part of a regular update. We have 1100 models which would require an extensive m...
Jose Pereira over 4 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Modelling of Septicity

As a sewer modeller I have occasionally been asked about odour generation in sewer networks. I have noticed that DO (dissolved oxygen) and BOD (biochemical oxygen demand) are both inputs in the wastewater and trade-waste model groups of Infoworks ...
Guest about 6 years ago in InfoWorks ICM / Results / Simulations / Water Quality 0 Gathering support

Different symbology for different defect types

In the initial release all observations are in a single layer. If we can break these out into continuous observations/defects, point defects, and connections that would be great. Specifically connections as stub outs are very impactful to customer...
Tim Medearis over 4 years ago in Info360 Asset / Customization / Styling 0 Gathering support

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood over 6 years ago in Other Product Ideas / Asset Management 0 For Review

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest over 6 years ago in Other Product Ideas / Asset Management 1 For Review

Consistent SHP Export Data Fields for 2D mesh elements in ICM

A simulation result can be exported to SHP files by right clicking the icon and choosing the Export menu. When the result is exported for a specific timestamp, some underlying data fields are not exported such as the elevation and area of a 2D ele...
Miyuki Okuda almost 5 years ago in InfoWorks ICM / Export Data 0 Gathering support

I&I Processing of Gravity Collection and Vertical Lift Stations

To be able to take I&I volumes or volume/diameter/foot electronic calculated tags from Info360 and process the R&R (i.e. CIPP lining, replacement, re-grout, CCTV, electroscan inspections, etc.) actions within Asset's Rehabilitation plan.
Guest almost 5 years ago in Info360 Asset 0 Will not implement

Enable RTK parameters to use rain gauge boundaries

Enable RTK parameters to use rain gauge boundaries with the SWMM5 engine
Guest about 3 years ago in InfoWorks ICM / Rainfall 0 Gathering support