Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Rehabilitation Planning

Showing 5

Ability to add comments within the Decision Tree

Provide the ability to add user comments at individual decision points within the decision tree to document rationale and assumptions.
Candice Valerio 24 days ago in Info360 Asset / Decision Tree Canvas 1 Under consideration

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez almost 3 years ago in Info360 Asset / Query types / Capabilities 1 Under consideration

Rehab Action Filter Options for Results need expanded

When querying a Rehab Action in the Results table, we only have the Operator option of 'is any of'. Looking to have the opposite available, something like 'is not equal too'. We are having to select many values to set the filter = where if we have...
Todd Plank 12 months ago in Info360 Asset / Query types / Capabilities 2 Under consideration

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Under consideration

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez over 2 years ago in Info360 Asset / Rehab actions & cost 0 Under consideration